S-2.1, r. 4 - Safety Code for the construction industry

Full text
9.1.5. (Revoked).
R.R.Q., 1981, c. S-2.1, r. 6, s. 9.1.5; O.C. 1959-86, s. 78; O.C. 1005-2015, s. 1.
9.1.5. The employer shall not commence works before:
(a)  having notified the Commission in writing;
(b)  having submitted the drawings required in paragraph c of subsection 2 of section 2.4.1 as well as the specifications of the operations; and
(c)  having obtained the written authorization of the Commission.
R.R.Q., 1981, c. S-2.1, r. 6, s. 9.1.5; O.C. 1959-86, s. 78.